Landscape Maintenance Schedule for the week of October 14

Maintenance Activities

Landscape MaintenanceMaintenance Activities

Landscape Maintenance

• General Maintenance Schedule (General weed control, pruning, and cleaning)

BellaVista, the new landscape contractor, has officially begun service. See maps and outline of the vendor’s various activities for October on The Villager Online. The schedule reflects days for mowing, combined mowing/cleaning, cleaning, and detailing. Detailing includes pruning, pulling weeds, and detailing plant material.

• Pest Control

Treatment for voles, moles, gophers, and squirrels—Glen Arden, Highland, Valle Vista—occurred on 10/14.

(Rozol Vole Bait, Talpirid, Gopher Coetter Type 2 Bait, Rodent Bait Diphacinone .005% and .01%). 

The treatment scheduled for 10/21 has been rescheduled to the week of 10/28.

Additional information about that appointment will be provided in next week’s report. 

o For Pesticide information on pest control or landscape, please contact Customer Service at 408-223-4670 or visit the Corporation Yard at 3401 The Villages Fairway Drive. San Jose, CA 95135 or visit the Resident Portal and click on the Pesticides button for pest control or landscape.

• Watering Schedule

The watering schedule has been changed to accommodate the new mowing schedule. The watering is still happening three times a week. Public works will provide an updated schedule 

• Beta Sites/Non-functional turf conversions – The Villages entry along Sonata/Del Lago in progress.

Association Maintenance

If your village is not listed below, there is not a large-scale project occurring within your community. However, Public Works continues to address ongoing standard maintenance and landscape requests within each village.

• Village Glen Arden—The roof replacement project is still ongoing.

• Village Valle Vista—Fire Hardening Project delayed.

o For clarification and as accurately reported on notices distributed throughout Village Valle Vista –“During the start of the project, Posey Design & Construction informed management the majority existing vent holes needed to be modified to fit the new Vulcan Plug. Additionally, the original vents received from the manufacturer were sent as louvered and not screened. As a result, Ryan Bell met with Posey Design and Construction and created a revised plan to install and complete the vent project.”

o Schedule—A revised schedule will be provided to all residents in the village upon receipt of the new and correct mesh vents from the manufacturer

• Village Del Lago—A forensic roofing inspection will occur on October 23 and October 24. The roof inspection’s purpose is to examine the existing roof condition to best predict the roof replacement timing. The Public Works team along with a collection of vendors will conduct a random sampling of the 54 buildings in Del Lago. Roof tiles in the selected areas will be removed to examine the condition of the building paper and bat-ten underneath the tiles. Notices will be distributed to the specifically selected building residents and impacted units next week.

For Pesticide information on pest control or landscape, please contact Customer Service at 408-223-4670 or visit the Corporation Yard at 3401 The Villages Fairway Drive. San Jose, CA 95135 or visit the Resident Portal and click on the Pesticides button for pest control or landscape.